The Duyên Hải Power Station is a complex of under-construction coal-fired power plants in Vietnam. It is located in Mu U Hamlet, Dan Thanh Commune, Duyên Hải District, Trà Vinh Province. The complex will have a total capacity of 4,400 MW.〔 〕 It includes also a seaport coal terminal, to be built by China Communications Construction Company, with a capacity of 12 million tonnes of coal and oil per year.〔 〕〔 〕 ==Duyen Hai 1== Duyen Hai 1 will have an installed capacity of 1,245 MW (2 X 622.5MW) and its annual output will be 7.5–8 GWh.〔 〕 The plant will cost US$1.5 billion.〔 It is owned by Vietnam Electricity. Engineering, procurement and construction contract was signed on 30 March 2010 and construction started on 19 September 2010. The main contractor is Chinese Oriental Power Group.〔 According to the contract, unit 1 would be operational by 25 July 2015 and unit 2 by 25 September 2015. It is expected that the first boiler at unit 1 would be fired on 25 October 2014. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Duyên Hải Power Station」の詳細全文を読む スポンサード リンク
|